Back to Blog
    Blog Post

    GD&T Drawing Review Checklist: 20 Checks Before Release

    October 8, 2026
    GD&T Drawing Review Checklist: 20 Checks Before Release

    A good drawing review checks six things in order: the title block and notes, the datums, the dimensions and basic dimensions, every feature control frame, the general tolerances, and whether inspection can actually measure what the drawing asks for. Below are 20 checks, one line each, written to ASME Y14.5-2018 so you can print them and work through the next drawing on your desk. After the list, you'll find the reasoning behind the checks that catch the most expensive mistakes.


    The 20 checks


    Work through the groups in order. A wrong datum scheme makes every frame that references it wrong too, so there's no point checking position tolerances before the datums are right.


    Title block and notes


  1. 1. The drawing names the standard and its edition, for example "Dimensions and tolerances per ASME Y14.5-2018", and states the units.
  2. 2. The revision in the title block matches the revision block, and the change described there is actually on the sheet.
  3. 3. Every general note applies to this part: material with grade and condition, finish, and no notes carried over from the drawing it was copied from.

  4. Datums


  5. 4. Each datum feature is a functional surface or feature of size that locates the part in its assembly and that an inspector can contact.
  6. 5. Each datum feature symbol is attached to a surface or a feature of size, never to a centerline, axis, or center plane.
  7. 6. Every datum letter used in a feature control frame is identified on the drawing, each letter is used once, and I, O, and Q are skipped.
  8. 7. Datum references in each frame follow the order the part is actually located in the assembly, primary first, not alphabetical order out of habit.

  9. Dimensions and basic dimensions


  10. 8. Every feature is fully defined for size, location, orientation, and form, with nothing missing and nothing dimensioned twice.
  11. 9. Every position, profile, and angularity tolerance has basic dimensions that locate or orient its tolerance zone from the datums it references.
  12. 10. Basic dimensions are boxed, or a general note says which untoleranced dimensions are basic, and no dimension is both basic and toleranced.
  13. 11. Reference dimensions are in parentheses, and nobody needs them to make or inspect the part.

  14. Feature control frames


  15. 12. No concentricity or symmetry symbols appear on a drawing that references the 2018 edition.
  16. 13. Form tolerances (flatness, straightness, circularity, cylindricity) have no datum references, and orientation tolerances (parallelism, perpendicularity, angularity) have at least one.
  17. 14. MMC and LMC modifiers appear only on features of size and datum features of size, never on a plane surface and never in a runout frame.
  18. 15. The diameter symbol precedes the tolerance only where the zone is a cylinder, such as position on a hole, and not where the zone is two parallel planes.
  19. 16. Each refinement is tighter than the control it refines: flatness smaller than the size tolerance and smaller than any orientation tolerance on the same surface.

  20. General tolerances


  21. 17. Every dimension is either toleranced directly, covered by the title block tolerance, basic, or reference, with no dimension left in between.
  22. 18. The title block tolerances fit the process, for example not holding a flame-cut plate to the same block as a ground shaft.

  23. Inspection


  24. 19. Each controlled feature can be measured with the datum reference frame the drawing specifies, using a setup a shop can build.
  25. 20. Someone from quality or manufacturing has read the drawing before release, and the critical characteristics are marked the way your company marks them.

  26. Why the tricky checks matter


    Most of the list is housekeeping. A handful of checks catch errors that look harmless on the screen and cost real money on the floor. Here is what goes wrong when each one is missed.


    Problem on the drawingWhat it causesFix
    No edition named in the title blockSupplier and customer argue over which rules applyName the standard and year in the title block or notes
    Datum on a non-functional surfaceParts pass inspection and don't fit the assemblyPick the surfaces that locate the part when it's installed
    Datum symbol on a centerlineNo defined feature to contact, so each inspector sets up differentlyAttach the symbol to the hole, shaft, or slot itself
    Position with no basic dimensionsThe tolerance zone has no defined locationAdd basic dimensions from the referenced datums
    MMC on a flat surfaceThe modifier has no meaning, and the frame is invalidRemove it, or apply the control to a feature of size
    Flatness larger than the size toleranceThe flatness callout controls nothingTighten it or delete it

    Datum order is a design decision


    The order of the datum letters in a frame is the order the part is located when it's inspected. For example, a bracket that bolts down on its bottom face and is located by two dowel pins should usually have the bottom face as primary and the pin holes after it. Swap the order and the inspector fixtures the part a different way, and a part that would assemble fine can measure out of tolerance, or the reverse.


    Concentricity and symmetry are gone


    The 2018 edition dropped both symbols. In the standard's wording, as quoted by GD&T Basics, the two symbols "are no longer supported" because other characteristics give more direct control with a well-defined meaning. If your drawing references 2018 and still shows either symbol, replace it, usually with position or runout depending on what the function needs. If the drawing references 2009, the symbols are still legal under that edition, which is another reason check 1 matters.


    Refinements must be smaller


    For an individual feature of size, Rule #1 already limits form. A flat face of a 0.500 plus or minus 0.005 thick plate can't be out of flat by more than the 0.010 size tolerance unless the drawing overrides the rule. A flatness tolerance of 0.015 on that face adds nothing. Run the same arithmetic for orientation, since a perpendicularity tolerance also limits the flatness of the face it controls.


    Modifiers need a size to modify


    MMC and LMC tie the tolerance to the actual size of a feature. A flat face has no size, so there is nothing to modify. Runout is always applied regardless of feature size, so a modifier in a runout frame is also wrong. Both errors show up when someone copies a frame from a hole callout to a face.


    How to run the review


    A checklist works best when the review itself has a routine. A few habits make it stick:


  27. Print the drawing. Mark it up in red. Errors that slide past on a monitor are easier to see on paper at full scale.
  28. Check against the model, not just the sheet. Make sure every dimension on the drawing matches the geometry it describes.
  29. Do one group per pass. Reading for datums and then for frames catches more than reading every check at once on every view.
  30. Have someone other than the author check it. The person who drew it reads what they meant, not what's on the page.
  31. Write down the repeat offenders. If the same check fails on drawing after drawing, that's a training problem, not a checking problem.

  32. That last point is where the checklist stops helping. A checker can catch a datum on a centerline every time. Teaching the people who draw it why it's wrong is what stops it showing up.


    When the same checks keep failing


    If your checkers keep marking up the same errors, the team needs a shared understanding of the standard, applied to your own parts. There are three ways we can help, priced from our GD&T training page:


    OptionWhat it coversPrice
    Half-day refresher and drawing reviewAbout 3.5 hours on-site, reviewing your own drawings with the team$2,500 for up to 12 participants
    2-day GD&T courseAbout 14 hours on-site, from reading frames to stack-ups, ending with a drawing review$8,000 for up to 8, then $300 each, up to 16
    Monthly lunch-and-learnTwo 90-minute sessions a month on current drawings and questions$1,200 per month

    For a team that already uses GD&T, the half-day refresher is the natural fit for this checklist. At full size it works out to about $208 per person ($2,500 divided by 12). We review a set of your drawings beforehand, and the session works through the errors that keep coming back. If the team is newer to GD&T, see what a 2-day course should cover. If you're weighing training against individual credentials, GD&T certification or team training compares the two. Engineers working on their own skills can book one-on-one GD&T tutoring.


    Next step


    Send us a few of your drawings, redacted if needed, along with your team size and timing. We reply within one business day with a proposal or a few questions. Request a proposal for the half-day refresher and drawing review, or see all corporate training programs.

    Zeeshan Saiyed

    About the author

    Zeeshan Saiyed

    Mechanical Engineer and STEM Tutor

    Zeeshan holds a BS and an MS in mechanical engineering from Georgia Tech, both with high honors, and spent more than eight years as a design engineer at Fortune 500 companies, designing components and creating their drawings to the latest GD&T standards. At Georgia Tech he was a teaching assistant for thermodynamics, fluid mechanics, and heat transfer. He now tutors FE exam, engineering, SAT, ACT, and math students one-on-one, in Richmond, Sugar Land, and Katy and online, and trains engineering teams in GD&T, FE exam prep, and technical communication.

    More about Zeeshan

    Frequently Asked Questions

    Who should check a drawing before release?

    Someone other than the person who drew it, who knows the standard and how the part is made and inspected. Many teams use a lead designer as the checker and have quality or manufacturing review the critical features before release.

    Does a drawing have to say which edition of Y14.5 it follows?

    It should. The 2009 and 2018 editions differ in places, such as concentricity and symmetry, so a drawing that doesn't name its edition leaves the supplier and inspector to guess which rules apply.

    What replaced concentricity in Y14.5-2018?

    No single symbol. Depending on what the function needs, position, runout, or total runout controls coaxial features more directly and is easier to measure repeatably.

    Does this checklist work for ISO drawings?

    The groups apply, but several rules differ under ISO GPS, including defaults for size and form. Review each drawing against the standard named in its title block.

    Can we use this checklist with our own drawing standard?

    Yes. Add your company's rules, such as how critical characteristics are marked or which notes are required, as extra lines under the matching group.

    Enjoyed this article?

    Read More Articles